Technical specifications

Aquapark "Riviera" was opened on August 30, 2007. This is one of the largest water parks in the region. The design and equipment was provided by WhiteWater LeisureLTD, a world leader in the design and manufacture of water attractions. For the manufacture of slides, modern high-strength plastic (glass fiber with helium coating) is used.

The water park uses the latest methods of water purification and disinfection in 3 stages:

  • mechanical cleaning (in 2 stages)

  • disinfection with modern chemicals with a low concentration of chlorine

  • modern ultraviolet sterilization

The water in the water park, covering an area of ​​more than 2,000 m³, goes through a full purification cycle in 2 hours. At the same time, in a constant mode, automatic testing of water takes place according to the following indicators:

  • temperature

  • chemical composition

  • PH level

At the same time, every 4 hours, the certified laboratory of the water park monitors the quality of water and the microclimate of the premises.

Every week, the water park checks the water by the Rospotrebnadzor service and draws up a protocol for the compliance of the project with sanitary and epidemiological standards.

In order to ensure maximum safety for visitors to the water park, all surfaces in the pedestrian zone: on the paths, platforms, stairs and in the pool exit area are made of non-slip material (imitation of pressed sand). Every day, the cleaning service cleans and disinfects all surfaces of the water park.